Garney Construction installing 42-inch DIP. 24-inch gate valve with electric actuator installed at wellfield manifold.
Doug Sessions Construction excavating trench for 24-inch PVC for collection lines.
Eckstine Electric wiring main disconnect at Well A7. Newton Masonry constructing control building.